Varadise Logo

Transforming Your
Management System with
Varadise's Cosmos

An advanced cloud-based platform that makes construction projects traceable, transparent, and trustworthy.

Introducing
Cosmos

The next evolution of centralized management platform, COSMOS leverages digital twin technology to visualize construction projects, enabling remote control and comprehensive management.

Phone UI

Generative AI Insights

Leveraging artificial intelligence, we offer proactive safety and compliance recommendations, helping you prevent issues before they arise and fostering a culture of accountability.

4D BIM and Simulation Engine

Our advanced simulation engine integrates time with project visuals, providing real-time monitoring and scenario modeling. This capability is powered by digital twin technology, allowing you to visualize every aspect of your construction projects digitally, enabling precise monitoring and remote control for informed decision-making.

Well-proved Solution with >100 Projects

Best Practice and Automated Compliance

Pioneer and advocator of industry standards

How it works?

Construction and City Management

icon

One-Stop Management Platform

Multiple projects management; Single and streamlined communication channels

icon

Spatial Management

Digital Twin and Scalable BIM ability

icon

All-rounded Integration

Effortless integration of devices; Future-proof solutions

icon

Self-configurable

Save time and resources; self-serve onboarding

Safety Leadership

icon

Best-in-class Workflows and Compliance Monitoring

Automated work flow with Generative AI; Compliance with the latest regulations

icon

Proactive Risk Detection

Proximity monitoring tool in construction with AI and work safety detection provide real-time alerts

icon

Data-Driven Insights and Guidance

Provision of actionable insights; Based on historical data and industry standards.

BIM Facility Management

icon

Enhancing ESG Compliance

Aligning with sustainability-related frameworks; Energy and resources monitoring; Support corporate's long-term sustainability goals

icon

Asset Management and cost-saving

Substantial savings; Reducing dependency on manual surveillance and tasks

icon

Predictive Maintenance Works

Proactive alerts for abnormalities; Timely interventions for potential risks; Maintenance needs identification

icon

Adopt Digital Twin Technology

Visualising daily operation; Prevention of costly repair; Minimisation of downtime

Contact Us

What are you looking for?

4S Products
Construction Management Platform
AI-powered Solution
Project Estimate
Partnership
Collaboration
Job Opportunities
Digitalized Management System
Media Response
Others

Tell us more about your needs

Ready to Transform the Future with Us?

Join us in shaping the future of construction. Discover how Varadise can elevate your operations today!

Landing Call to Action